PRELIMINARY

Food Service Water & Ice Hygiene
Clean Water. Clean Ice. Better Business.
- Public engineering check
- Independent food-service and ice branches
- Live C, CT, flow, and runtime transparency
Quick Engineering Check
Choose the application architecture, then enter measured project conditions. The recommendation rules are preserved; added C and CT outputs remain preliminary and transparent.
Engineering Results
Every value below opens the shared calculation modal with its formula, current inputs, substitution, location, and assumptions.
Within model range
Outlet estimate · informational unless target entered
User-entered effective contact path
No external acceptance standard asserted
Informational runtime projection
WDS1200X + WDS600X
- WDS1200X serves the coordinated coffee, beverage, and sink/faucet branch.
- WDS600X is the preliminary dedicated ice-point selection under the approved UF rule.
- UF pretreatment and ice production at or below 700 lb/day satisfy the approved preliminary application rule.
- Maximum fill duration or flow must be added during engineering validation.
Engineering classification: Product selection is preliminary. C and CT are calculated engineering outputs, not verified acceptance claims. Final design requires measured peak flow, water quality, equipment demand, and an approved project target.
C and CT Graphs
Axes, units, current values, and optional project targets use the same live inputs as the KPI cards.
Estimated C vs Peak Flow
Estimated CT vs Contact Time
Two-Branch Food Service Architecture
The approved application separates the coordinated food-service branch from the independently evaluated ice-machine branch.

Products for the Selected Architecture

WDS1200X
Coordinated coffee, beverage, and sink/faucet branch.
View product →
WDS600X
Dedicated single-point or qualifying UF ice branch.
View product →Inputs, recommendation, C, CT, flow, runtime, graphs, and the working diagram are public. Pricing, CAPEX, OPEX, ROI, payback, and commercial savings are intentionally not included in this migration.
Confirm the project design basis
Submit actual peak flow, water quality, equipment demand, and the intended performance target before procurement.
