EXTERNAL INSTALLATIONSmall Examination Room
Installed immediately beside the wall-mounted air conditioner so the room airflow carries treated air through the compact clinical zone.

Compact Air Hygiene System
Localized humidified ozone and ROS support for compact occupied environments.
CE Mark: Conformité EuropéenneEach example uses the same real HAS Mini product photograph. Placement remains external, accessible, and close to the intended airflow or treatment point.
EXTERNAL INSTALLATIONInstalled immediately beside the wall-mounted air conditioner so the room airflow carries treated air through the compact clinical zone.
EXTERNAL INSTALLATIONA compact wall installation keeps the unit visible and accessible inside the patient cabin without obstructing the treatment area.
EXTERNAL INSTALLATIONMounted externally, directly beside the refrigerated display, with a short delivery path to the controlled cabinet zone.
EXTERNAL INSTALLATIONA compact external installation beside the machine keeps the HAS Mini outside the ice bin and clear of service access.
Conceptual placement shown for planning. Final mounting, tubing, duty mode, ventilation, and safety requirements must follow the current HAS Mini manual and site engineering review.
Portable installation guidance from the existing Indoor Air product profile and controlled product documentation.
Mount on a stable surface close to the intended delivery point and protect the unit from prolonged direct sunlight.
Complete all tubing before power-up and keep the ozone delivery path unobstructed.
Select continuous or intermittent duty to match the approved small-zone operating plan.
Evaluate this product using its original product-specific operating logic. For full cross-platform site design, continue to the Indoor Air Engineering Application.
Certification claims are read from the shared BES certification registry. Available controlled documents are linked from the product resource center.
Room conditions, coverage, quantity and operating strategy are evaluated in the Indoor Air Engineering application. This page documents the product itself.
Use the water quality, clearance, power and mounting requirements stated in the current product manual. Site conditions should be reviewed before installation.
The English manual identifies continuous operation plus 10/10, 5/15 and 5/25 minute intermittent patterns.